Ford / SK Battery Plant – $5.5B
Projects
Mechanical, Electrical & Plumbing Commissioning
Mechanical Design: Commissioned HVAC and industrial dehumidification systems supporting EV battery manufacturing environments to maintain strict temperature, humidity, and particulate control requirements critical to lithium-ion cell production. Verified system operation through functional performance testing, controls integration validation, airflow balancing coordination, and sequence-of-operations testing to ensure stable environmental conditions across production spaces.
Supported functional testing and commissioning activities for equipment including air handlers, desiccant dehumidification systems, chilled water systems, and building automation controls to reduce contamination risk, prevent moisture-related defects, and maintain manufacturing reliability.
EV Charger (EVSE) : J1772 to J3400 (Tesla) PCB Adaptation
Designed a 16A SAE J1772 EVSE compatible with Ford Lightning vehicles, including support for J3400/NACS-equipped vehicles via a J1772-to-J3400 adapter.
Performed root-cause analysis on Control Pilot (CP) signaling issues including PWM duty cycle timing and missing –12V low-phase swing. Implemented firmware fixes for real-time PWM duty update and CP voltage validation, and redesigned the CP hardware stage by adding a 1kΩ pull-down resistor, 1N4148 diode, and 0.1µF filter capacitor for clean ±12V CP waveform. Updated PCB layout and verified with DRC (0 errors).